
When the motorway becomes an e-highway
Traffic
Project
Project name: ELISA – Elektrifizierter, innovativer Schwerverkehr auf Autobahnen (Electrified, Innovative Heavy-Duty Transport on Motorways).
duroZINQ hot-dip galvanising of around 230 masts used for the construction of Germany's first test track for electrically powered lorries…

Sometimes it just has to be vertical
Traffic
Project
verticalZINQ surface finishing of the rails from the PILA assembly system with different cross-sections (for example 80 x 50 millimetres or 100 x 100 millimetres) in various wall thicknesses and with different...

Well protected and ready for eternity
TrafficGermany's longest gantry crane installed
Installation of the gantry sign on the A7
Project
For the steel main elements and supports of a huge gantry sign with unit weights of up to 12.5 tonnes…



