R30-Fire protection through hot-dip galvanizing

hhpberlin – Fire Protection Engineers Ltd
Picture credits: © hhpberlin – Ingenieure für Brandschutz GmbH

 

Project

The terminal building of the Cruise Center Baakenhöft in Hamburg's eastern HafenCity on Kirchenpauerkai is considered a genuine novelty for Germany.

In the eastern HafenCity at Kirchenpauerkai, an alternative terminal was to be built for the well-known Hamburg Cruise Terminal HafenCity in the southern Überseequartier, which is itself only a temporary facility. The special feature of the new Baakenhöft terminal: for the first time in Germany, a building with R30 fire protection was realised using hot-dip galvanising.

Realisation

The structural steelwork was carried out by Holtkamp Stahlkonstruktionen GmbH in Nottuln in accordance with the specifications of DIN EN 1090-2, and approximately 80 tonnes of steel were then transported to ZINQ at the Gelsenkirchen site. In accordance with the assembly concept, the components were pre-commissioned after hot-dip galvanising and delivered to the construction site in this manner. The building was completed as planned in May 2020.

„100 profile sections and 24 tension rods were finished by ZINQ in accordance with DIN EN ISO 1461 and DASt guideline 022. The collaboration was, as usual, service-oriented and reliable.“
Guido Holtkamp, Holtkamp Stahlkonstruktionen GmbH

© Schienbein Industrielle Dach- und Fassadentechnik GmbH

© Schienbein Industrielle Dach- und Fassadentechnik GmbH

Client:

Schienbein Industrial Roof and Façade Technology Ltd (Main Contractor)

Holtkamp Stahlkonstruktionen GmbH (steel construction company)


galvanising

ZINQ Gelsenkirchen GmbH & Co. KG

Project management:

Mr Bernd Jung, Key Account Manager
Phone: +49 152 04169848
E-mail: bernd.jung@zinq.com

Would you like to stay regularly informed?

>> to the ZINQ newsletter registration
Search